摘要
介绍了合武客运专线工程的总体情况,并从系统技术和工程管理等方面对合武客运专线工程建设进行了总结。
To introduce the general information about Hefei-Wuhan dedicated passenger line project, and make the conclusion of Hefei-Wuhan dedicated passenger line construction from aspects of system technology and construction management.
出处
《铁路通信信号工程技术》
2009年第3期31-33,42,共4页
Railway Signalling & Communication Engineering
关键词
合武铁路
通信信号系统
系统集成
Hefei-Wuhan Railway, Signal and communication system, and System integration