摘要
以深圳地铁二号线景田站车站为例,针对工程地处深圳最繁华地段,地下管线的数量和种类非常多,拆迁工程量大的特点,介绍了如何在施工时采取悬吊保护措施,以保证管道的正常使用。
Taking the Jingtian station of the second line in Shenzhen subway as example and aiming at the characteristics that the project locates on the most prosperous section in Shenzhen, the number and kinds of the underground pipeline is very large, and the large removal quantity, the author introduces how to adopt suspicion protection measure in construction, so as to ensure the normal operation of the pipeline.
出处
《山西建筑》
2009年第19期150-151,共2页
Shanxi Architecture
关键词
地下管线
悬吊
方案
保护方法
underground pipeline, suspicion, scheme, protection method