摘要
首先分析了几种开采沉陷预计数据(下沉,倾斜,曲率,水平移动和水平变形)的特点,介绍了上述几种数据的表达方式,根据数据特点提出了沉陷预计结果数据的预处理方法。通过研究提出了将预计结果数据嵌入矿区DEM的方法——双线性重采样插值法,经实例验证该方法达到了预期目标,为矿区的DEM更新做出了贡献。
The characteristics of several kinds of forecast resuh data of mining subsidence ( sinking, inclination, curvature, horizontal movement and horizontal deformation) and their representation methods were analyzed. Based on this, a pre-treatment method for the forecast result data of subsidence was proposed. As a result of the research, a method for embedding these data in mine DEM-bilinear resampling interpolation was put forward, which was proved to have attained the goal by real case, making a contribution to mine DEM updating.
出处
《金属矿山》
CAS
北大核心
2009年第6期104-106,144,共4页
Metal Mine
基金
徐州师范大学自然科学基金重点项目(编号:07XLA13)
关键词
概率积分法
开采沉陷预计数据
双线性重采样插值方法
DEM
Probability integral method, Mining subsidence forecast data, Bilinear resampling interpolation, DEM