南京大胜关长江大桥主桥钢梁南边跨合龙技术 被引量:11

Closure Techniques for South Side Span Steel Girder of Main Bridge of Dashengguan Changjiang River Bridge in Nanjing
下载PDF
导出
摘要 京沪高速铁路南京大胜关长江大桥主桥为2联(84+84)m连续钢桁梁+(108+192+336+336+192+108)m六跨连续钢桁拱桥。六跨连续钢桁拱桥分4个合龙点,先192 m边跨合龙,再中跨合龙。介绍该桥主桥南边跨合龙的特点、技术措施、合龙前的架设状态、合龙步骤。 The main bridge of Nanjing Dashengguan Changjiang River Bridge on BeijingShanghai High-Speed Railway is composed of two units of (84 + 84) m continuous steel truss girders and six spans of (108+192+336+336+192+108) m continuous steel truss arches. The six-span steel truss arches are closed at four closure points, in which the 192-m side spans are closed first and the 336-m main spans are later. This paper presents the characteristics, technical measures, erection status before closure as well as the closure steps of the south side span steel girder of the bridge.
出处 《桥梁建设》 EI CSCD 北大核心 2009年第3期9-11,84,共4页 Bridge Construction
关键词 钢桥 桁架拱桥 桥梁架设 合龙 施工方法 steel bridge truss arch bridge bridge erection closure construction method
  • 相关文献

参考文献3

同被引文献45

  • 1李芳军,赵志尚,朱鹏飞.万州长江大桥钢桁拱梁合龙技术[J].桥梁建设,2006,36(1):56-58. 被引量:19
  • 2秦顺全.宜万铁路万州长江大桥设计与施工[J].铁道工程学报,2006,23(2):20-23. 被引量:10
  • 3潘东发,李军堂.南京大胜关长江大桥钢梁安装方案研究[J].桥梁建设,2007,37(3):5-8. 被引量:23
  • 4中铁大桥勘测设计院有限公司.南京大胜关长江大桥初步设计文件[Z].2006.
  • 5中铁大桥勘测设计院有限公司.南京大胜关长江大桥施工图设计文件[Z].2007.
  • 6中南大学.南京大胜关长江大桥道碴整体桥面结构分析与试验研究[R].2006.
  • 7铁道科学研究院.南京大胜关长江大桥结构构造疲劳性能试验研究[R].2007.
  • 8中铁大桥局集团武汉桥梁科学研究院有限公司.南京大胜关长江大桥整体钢桥面板与主桁节点板连接细节疲劳试验报告[R].2008.
  • 9汪一骏.钢结构设计手册(上册)[M].北京:中国建筑工业出版社,2004.
  • 10于祥君,刘博.南京大胜关长江大桥8号墩钻孔桩施工进度控制技术措施[C]//京沪高速铁路南京大胜关长江大桥工程技术论文集(上册).北京:中国铁道出版社,2009:195-202.

引证文献11

二级引证文献93

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部