摘要
介绍了在上海市闵浦二桥工程中,为保留沪闵路两侧569棵香樟树,做了两套工程方案。经比选,采用了引桥高架位于路中的方案。在道路建设中,还对树木保护采取一些工程措施,对香樟树移植过程明确了工艺要求。
There were two construction plans to preserve 569 camphor trees along the two sides of Humin Road in Shanghai Second Minpu Bridge project.A plan of setting the approach viaduct in the road centre was adopted through comparison and selection.The selected plan also pointed out some project measures and process requirements during road construction.
出处
《中国市政工程》
2009年第3期21-23,共3页
China Municipal Engineering
关键词
树木保留
香樟树
高架引桥
移植
tree preservation
camphor tree
approach viaduct
to transplant