期刊文献+

苏州河水系截污治污工程中基坑围护设计方案

Design Plan of Bracing of Foundation Pit in Suzhou River Water System Sewage Interception and Treatment Project
下载PDF
导出
摘要 简述了城市基坑工程的地下连续墙、钻孔灌注桩+深层搅拌桩、型钢水泥土搅拌墙、重力式等4种围护方案。针对苏州河水系截污治污工程中大武川、长桥、梅陇等3座旱流污水截流设施,介绍了具体的设计方案和施工。 The four bracing plans of urban foundation pit project were mentioned including underground continuous wall,bored pile combined with deep mixing pile,steel cement soil mixing wall and gravity bracing structure.Aiming at the three sewage interception facilities(Da Wuchuan,Changqiao and Meilong) of Suzhou River water system sewage interception and treatment project,the detailed design plan and construction were put forward by the author.
作者 应俊
出处 《中国市政工程》 2009年第3期59-60,共2页 China Municipal Engineering
关键词 污水截流 截污治污 基坑围护设施 设计 sewage interception sewage interception and treatment bracing of foundation pit facilities design
  • 相关文献

参考文献4

  • 1龚晓南,等.深基坑工程设计施工手册[M].北京:中国建筑工业出版社,2001.
  • 2中国建筑科学研究院.建筑基坑支护技术规程[M].北京:中国建筑工业出版社,1999..
  • 3吴泳川,陈琦.深基坑工程中现场监测的回顾与展望[J].天津城市建设学院学报,2001,7(2):88-90. 被引量:24
  • 4龚晓南.地基处理手册[M].2版.北京:中国建筑工业出版社,2008.

二级参考文献3

共引文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部