1Orlowska E. Incomplete Information: Rough Set Analysis [M]. NewYork:Physica Veri,1998.
2Yager R R.Including Probabilistic Uncertainty in Fuzzy Logic Controller Modeling Using Dempster Shafer theory [J].IEEE Transactions on Systems Man and Cybernetics,1995,25(8).
2Christopher A. Sims.Empirical Analysis of Macroeconomic Time Series: VAR and Structural Models: by Michael P. Clements and Grayham E. Mizon[J]. European Economic Review, 1991,35:922- 932.
3Tsay, R.S.Testing and Modeling Threshold Autoregressive Processes [J]. Journal of the American Statistical Association, 1989,84:231- 240.
4Tsay, R.S.Testing and Modeling Multivariate Threshold Models[J]. Journal of the American Statistical Association, 1998, 93: 1188- 1202.
5Engle R.F,Granger C.W.J. Co-integration and Error Correction:Representation, Estimation, and Testing[J]. Econometrica, 1987,55(2): 251-276.
6Clements, M.P., & Galvao, A.B. A Comparison of Tests of Nonlinear Cointegrated with an Application to the Predictability of US Interest Rates Using Their Term Structure [J]. International Journal of Forecasting, 2004,20:219-236.
7Enders, W., & Siklos, P.L. Cointegration and Threshold Adjustment[J]. Journal of Business and Economic Statistics, 2001,19: 166-176.
8De Gooijer, J.G., & Vidiella-i Anguera, A,Foreeasting Threshold Cointegrated Systems [J]. International Journal of Forecasting, 2004,20.237-253.