高矮墩大跨度连续刚构桥施工控制研究 被引量:3

Research in Construction Control of Continuous Rigid Frame Bridge with Long Span and High-low Pipers
下载PDF
导出
摘要 文章以翟家河大桥为工程背景,介绍了预应力混凝土连续刚构桥的施工控制原理和方法,阐述了墩高相差悬殊的连续刚构桥的施工控制要点。通过翟家河大桥施工控制的验证,论证了文中所述施工控制方法对高矮墩大跨度连续刚构桥施工控制的可靠性及实用性,最后对此类大桥的施工控制理论与方法提出了一些建议。 Based on Zhai Jiahe Bridge, the paper introduced the theory and methods of construction control in prestressed concrete continuous rigid frame bridge, and came up with some key- points of the construction control in the continuous rigid frame bridge with pipers in extremely different height. The effective construction controlling in Zhai Jiahe Bridge illustrates the reliability and practicability of the control methods the paper comes up with. Finally, some suggestions are proposed about the construction control in prestressed concrete continuous rigid frame bridge.
出处 《建材世界》 2009年第3期85-88,共4页 The World of Building Materials
关键词 连续刚构桥 悬臂施工 施工控制 continuous rigid frame bridge cantilever construction construction control
  • 相关文献

参考文献3

  • 1范立础.桥梁工程[M].北京:人民交通出版社,2001..
  • 2刘代全.预应力混凝土连续刚构桥的施工控制[M].长沙:湖南大学土木工程学院,2003.
  • 3公路钢筋混凝土及预应力混凝土桥涵设计规范(JT-GD62-2004)[S].北京:人民交通出版社,2004.

共引文献502

同被引文献8

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部