深溪沟大桥缆索吊装系统地锚设计分析 被引量:1

Design Analysis of Anchors of Rope Hoisting System of the Shenxigou Bridge
下载PDF
导出
摘要 介绍了深溪沟大桥施工环境条件,针对该大桥施工地质条件复杂、场地受限和起吊荷载大等因素,提出了深溪沟大桥缆索吊装系统的遂洞式地锚方案,并给出了地锚结构形式详细设计及计算。该隧洞式地锚设计为深溪沟大桥缆索吊装系统提供了安全、经济和有效的施工作业环境。 The construction environment conditions of the Shenxigou Bridge were introduced, according to characteristics of the bridge such as complicated topographic conditions, limited construction site, and huge hoisting load. The tunnel anchor scheme of rope hoisting system of the Shenxigou Bridge was put forward, and the structure design and calculation of tunnel anchors were given out. The design of these provides safety, economic and effective construction conditions for the rope hoisting system of the Shenxigou Bridge.
作者 孙秀民
出处 《建材世界》 2009年第3期89-91,共3页 The World of Building Materials
关键词 缆索吊装 遂洞式地锚 设计与计算 rope hoisting system tunnel anchor design and calculation
  • 相关文献

参考文献2

  • 1洪毓康.土质学与土力学[M].北京:人民交通出版社,1997.36-47.
  • 2交通部第一公路工程总公司.公路施工手册·桥涵[M].北京:人民交通出版社,2000..

共引文献29

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部