摘要
文中主要对设计阶段有效控制工程造价,把设计招标、限额设计、运用优化设计、设计投资进行审查四者有机的结合起来,对工程实际采用不同的方法灵活的加以应用,使工程造价控制在合理的范围内,并对工程造价质量的提高作了阐叙。
This article mainly to the design stage active control building cost of projects, the design tender, the quota design, using the optimization design, the design investment carries on examines four organic unions, uses the different method to the project nimble to apply actually, causes the building cost of projects control in the reasonable scope, and did to the building cost of projects quality's enhancement clarified narrates.
出处
《物流工程与管理》
2009年第6期110-111,共2页
Logistics Engineering and Management
关键词
工程造价控制
限额设计
工程造价
编制质量
Building cost of projects control
Quota design
Building cost of projects
Establishment quality