期刊文献+

系统仿真技术在优化妇科门诊治疗流程中的应用研究 被引量:3

The application of system simulation technology in the optimization of gynecological out-patient treatment process
下载PDF
导出
摘要 目的优化妇科门诊治疗流程,提高医疗服务水平和资源利用率。方法对无锡某医院妇科门诊治疗中心的工作流程进行调查,根据病人病情和治疗方案的不同,将病人分为5组,收集每组病人到达时间间隔及治疗时间,运用Med-Model专业软件建立该院妇科门诊治疗流程的仿真模型,分别模拟目前的工作流程和改进方案。结果在现行的工作流程和资源分配模式下,病人的平均等候治疗时间较长。通过优化医疗资源配置和病人就诊次序,第二和第三治疗室的病人候诊时间可分别从7.07s和10.47s缩短为3.04s和5.07s。结论仿真结果显示改进后的方案在资源利用和病人候诊时间方面比较合理,是目前妇科门诊治疗中心较好的运行方案。 Objective In order to improve the gynecological outpatients' treatment process as well as the utility of medical resources. Methods A field study is conducted at a gynecological out-patient treatment center in Wuxi. Patients are divided into 5 groups according to their condition and treatment protocol, the time between arrival and service time for each group are gathered respectively. A simulation model is setup and analyzed using Med-model to simulate and compare the current work process and the improvement program. Results Under the current work process and resource allocation pattern, the outpatients' average waiting time is relatively long. Through the optimized registration process and re-distribution of medical resourcess, the average waiting time of NO.2 and NO.3 treatment room can be shorten from 7.075 to 3.04s and from 10.47 to 5.07s respectively. Conclusion The improvement program is more reasonable both in resource allocation and outpatients' waiting time.
出处 《中国医院管理》 2009年第7期28-30,共3页 Chinese Hospital Management
基金 上海市重点学科建设项目(B907)
关键词 医疗管理 妇科治疗流程 仿真 healthcare management, gynecological treatment process, simulation
  • 相关文献

参考文献9

  • 1张晓纲,刘学勇.结合综合性医院门诊就诊特点 强化门诊特色管理[J].中国医院管理,2006,26(4):54-56. 被引量:16
  • 2王雪峰.数字化医院门诊病人就诊流程的优化[J].中国医院管理,2007,27(4):50-51. 被引量:45
  • 3秦超,李瑞兴,吴小松,等.卫勤系统仿真导论[M].上海:第二军医大学出版社.2007:164-166.
  • 4马东彦.仿真建模在医院布局优化中的应用[J].中国医院管理,2007,27(2):51-53. 被引量:4
  • 5鲁翔,许年珍,袁永根,黄如春,赵俊,占伊扬,梁静恰.大型医院医疗流程和资源配置的仿真决策系统研究[J].中国医院管理,2005,25(1):10-13. 被引量:19
  • 6Rahul K Khare,Emilie S Powell,Gilles Reinhardt. Addirg more beds to the emergency department or reduing admitted patient boarding times: which has a more significant influence onemergency department congestion [J]. Annals of Emergency Medicine, 2008(7): 1-11.
  • 7Siebren Droothuis,Godefridus G van Merode,Arie Hasman.Simulation as decision tool for capacity planning[J]. Computer Methods and Programs in Biomedicine, 2001(66): 139-151.
  • 8Oddoye J P, Jones D F, Tamiz M. Combining simulation and goal programming for heahhcare planning in a medical assessment unit[J]. European Journal of Operational Research, 2009(193): 250-261.
  • 9Noah D Glick,Craig Blackmore C,William N Zelman.Extending simulation modeling to activity-based costing for clinical procedures [J] .Journal of Medical Systems,2000, 24(2) : 77-89.

二级参考文献14

共引文献82

同被引文献25

  • 1许崇伟,沈俊学,邓光璞,熊瑶,邹俐爱.医院门诊量影响因素及预测方法[J].中国卫生经济,2015,34(3):74-75. 被引量:14
  • 2苏强,姚晓耘,施京华.基于Med Model的医院挂号流程仿真与优化[J].工业工程与管理,2006,11(6):59-63. 被引量:18
  • 3马东彦.仿真建模在医院布局优化中的应用[J].中国医院管理,2007,27(2):51-53. 被引量:4
  • 4张音,徐勇勇,蔡永宁.医院——非线性复杂系统的综合评价[J].中华医院管理杂志,1997,13(6):353-355. 被引量:6
  • 5Fernando C Coelli, Rodrigo B Ferreira, Renan Moritz V R, et al. Computer simulation and discrete-event models in the analysis of a mammography clinic patient flow[J]. Computer Methods and Programs in Biomedicine, 2007, 87: 201-207.
  • 6Syi Su, Chung-Liang Shih. Managing a mixed-registration-type appointment system in outpatient clinics[J]. International Journal of Medical Informatics, 2003, 70: 31-40.
  • 7Linda V Green, Sergei Savin, Ben Wang. Managing Patient Ser- vice in a Diagnostic Medical Facility[J]. Operations Research, 2006, 54(I): 11-25.
  • 8Jinn-Yi Yeh, Wen-Shan Lin. Using simulation technique and ge- netic algorithm to improve the quality care of a hospital emergency department[J]. Expert Systems with Application, 2007, 32: 1073- 1083.
  • 9Ridge J C, Jones S K, Nielsen M S, et al. Capacity planning for Intensive Care Units[Jl. European Journal of Operational Research, 1998, 105: 346-355.
  • 10Merbil Gonzfflez-Martinez, Jos6 A Borges, Jos6 Navarro. An Auto- matic Resource Scheduling System(ARSS)[J]. Computer & Industry Engineering, 1997, 33(1/2): 295-298.

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部