摘要
水电厂计算机监控系统调试过程复杂,内容繁多。三峡右岸计算机监控系统现场调试工作在人员配合、资料准备、调试规程等方面制定了一系列的规范,达到了提高工作效率和调试质量的目的。通过对三峡右岸监控系统调试工作的总结,深入探讨水电厂监控系统调试工作的标准化。
For the wide range of issues and multifarious steps involved,the commissioning of SCADA system in Three Gorges Right Bank Hydropower Station is a complex process.The rules for personnel assignment,document prepare ensure the high quality and efficiency in commissioning.This paper sums up the experience on the commissioning of SCADA system and discusses the standardized commissioning procedure.
出处
《水电站机电技术》
2009年第3期32-33,共2页
Mechanical & Electrical Technique of Hydropower Station
关键词
三峡右岸
计算机监控
现场调试
标准化
right bank of Three Gorges
computer monitoring
commissioning test
standardization