摘要
浙江省大多数流域防御洪涝灾害的工程性措施未能得到全面实施,以及还有众多的小流域尚无防洪工程性措施,经过对钱塘江流域二个案例的分析,从工程性和非工程性措施建设的两个方面来研究具体实施流域性洪灾防范及应急处置。
In Zhejiang Province,the majority of engineering measures concerning the flood prevention and control have not been fully implemented and so do a large number of small rivers. Based o on these two facts, this paper analyses the flood prevention and control on the Qiantang River, taking two eases as examples from engineering and non-engineering aspects.
出处
《金华职业技术学院学报》
2009年第3期90-93,共4页
Journal of Jinhua Polytechnic
基金
2008年浙江省社科联重点项目(08Z47)
关键词
钱塘江流域
洪涝灾害
洪灾防范
应急处置
drainage basin of the Qiangtang River,floods disaster,flood prevention,emergency management