期刊文献+

导管架下水驳船的“浮托法”安装改造研究 被引量:7

Float-over installation modification analysis of jacket launch barge
下载PDF
导出
摘要 导管架下水驳船是实施大型深水导管架下水的必要装备。"浮托法"安装模式是大型平台组块海上安装的发展趋势。对"海洋石油229"号导管架下水驳船"浮托法"安装改造前、后的总体性能进行了对比分析。 The jacket launch barge is the necessary equipment float-over installation mode is the trend for offshore installation comparative analysis of the overall capability of the original for launch operation of large deep water jacket. The of large size platform topside. The article introduces and the float-over modified jacket launch barge HAI YANG SHI YOU 229.
出处 《船舶》 2009年第3期45-49,64,共6页 Ship & Boat
关键词 导管架下水驳船 “浮托法”安装 总体性能 jacket launch barge float-over installation Overall performance
  • 相关文献

参考文献3

  • 1Alp Kocaman, Richard Newhouse, Lee Taylor, Juan Seto, Ray Scippa. Intermac 650: Changing form for changing times [J]. Offshore, 2006, 66(8) :106 -112.
  • 2海洋石油工程股份有限公司.3万吨导管架下水驳船改造概念设计分析报告[R].2008.
  • 3杨晓刚.深水导管架滑移下水的安装分析技术和设计方法[J].中国海上油气(工程),2003,15(3):4-10. 被引量:21

二级参考文献8

  • 1Sircar S. Transportation, Launch, and Self- Upend Analysis of the Kilauea Jacket Using Proven Analytical Techniques. OTC6254,1990.
  • 2Serpas R J. Installation of the Kilauea Jacket and Pile and Full -Scale Validation of Analytical Predictions. OTC 6265,1990.
  • 3Adams A J. Dynamic of Fixed Marine Structures. Third Edition,NDP Barltrop, 1991.
  • 4Robin M C. The Design Experience for a One- Piece Jacket, 935 Feet of Water, Gulf of Mexico. OTC 4186,1982.
  • 5Campvell R B. Instrtanentation of the SYU Jackets for Trans -Pacific Tow and Launch. OTC 6687,1991.
  • 6Raymond G G. Load to Installation of the Muchison Jacket. OTC 3837,1980.
  • 7London Offshore Consultants Limited.Guidelines for Marine Operations.OPL, 1997.
  • 8DnV. Rules for Planning and Execution of Marine Operations.Part 2:Operation Specific Requirements, 1996.

共引文献20

同被引文献28

引证文献7

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部