摘要
基础筏板大体积混凝土施工中,通过对混凝土材料选择、配合比设计等方面进行精心施工准备,并且在施工工艺、后期养护和现场监测等方面采取了一系列温控防裂技术措施,一次性连续浇筑成功,未出现有害裂缝,施工效果良好。
In the construction of concrete in mass of foundation raft, we prepare well in aspects of materials selection and design of concrete, and implement temperature controlling & anti -resistant technological measures with regards to construction process, post maintenance and field monitoring. So the one - off continuous concreting is successful with no damaging crack. The construction performs well.
出处
《福建建筑》
2009年第6期78-80,共3页
Fujian Architecture & Construction
关键词
基础筏板
防裂
优化配合比
浇筑策划
温控
保温保湿
Foundation raft Anti - resistant Optimized design of concrete Concreting scheme Temperature control Heat & humidity preservation