摘要 为解决黄河沙坡头水利枢纽泥沙问题,利用一维全沙数学模型,对有无大柳树水库条件下的沙波头水库不同运用方式进行分析计算,认为正常蓄水位1240.5m、汛期7~9月1238m运用方式能有效保持水库的兴利调节库容,且对上游的大柳树水库不造成影响。 In order to solve sediment problem of the Shapotou Water Control Project on the Yellow River,analysis and calculation for various operation modes were carried out with onedimension mathematics model and the result is that the operation mode with 1 2405 m of normal highwater level and 1 238 m of water level during July to September not only can keep regulating storage effectively but also there is no effect to the Daliushu Reservoir on the upstream
作者 郑贺新
出处 《水利水电工程设计》 1998年第2期28-29,34,共3页 Design of Water Resources & Hydroelectric Engineering
关键词 泥沙 冲淤 调节库容 水库泥沙 sediment,scouring and silting,mathematics model,operation mode regulating storage