摘要
为解决黄河沙坡头水利枢纽泥沙问题,利用一维全沙数学模型,对有无大柳树水库条件下的沙波头水库不同运用方式进行分析计算,认为正常蓄水位1240.5m、汛期7~9月1238m运用方式能有效保持水库的兴利调节库容,且对上游的大柳树水库不造成影响。
In order to solve sediment problem of the Shapotou Water Control Project on the Yellow River,analysis and calculation for various operation modes were carried out with onedimension mathematics model and the result is that the operation mode with 1 2405 m of normal highwater level and 1 238 m of water level during July to September not only can keep regulating storage effectively but also there is no effect to the Daliushu Reservoir on the upstream
出处
《水利水电工程设计》
1998年第2期28-29,34,共3页
Design of Water Resources & Hydroelectric Engineering
关键词
泥沙
冲淤
调节库容
水库泥沙
sediment,scouring and silting,mathematics model,operation mode regulating storage