摘要
大朝山水电站上游临时土石围堰和下游土石过水围堰基础覆盖层厚、透水性强,具有深水填筑,要求闭气时间短等特点。在设计中,通过堰型选择,采用堰体粘土心墙、覆盖层高压喷射灌浆板墙防渗型式。下游土石过水围堰采用混凝土楔型体结合钢筋笼块石护面等新技术,解决了土石围堰防渗和渡汛保护问题。
The upstream temporary earth and rockfill cofferdam and the downstream earth and rockfill over-topping cofferdam are characterized by their foundations having thick overburden and high permeability as well as under _ water placement and short closing time for the construction of the Dachaoshan Hydropower Project. A clay core earth and rockfill cofferdam with a high pressure gunite impervious wall in the overburden has been built through comparison between different types of cofferdams in the desigm , and the new technique has been employed for the downstream earth and roxkfill overtopping cofferdam, which is composed of a concrete wedge _ shaped body in combination with reinforcing _caged block stones to solve impermeability and protection problem during flood seasons.
出处
《云南水力发电》
1998年第1期42-46,共5页
Yunnan Water Power
关键词
水电站
土石围堰
高压喷射灌浆
防渗墙
设计
Dachaoshan Hydropower Project Overtoppin cofferdam High pressure gunite