摘要
大朝山水电站工程是澜沧江上继漫湾之后的第二座大型水电部工程,1997年11月10日安全圆满实现大江截流。
The Dachaoshan Hydropower Project is thse second large hydropower development after completion ofthe Manwan Hydropower Station on the Lancang River . The river closure rfor the Dachaoshan Hydropower Project was safely and successfully implemented on 10 November, 1997.This paper gives a brief presentation of the implementation of the river closure for the Dachaoshan Hydropower project .
出处
《云南水力发电》
1998年第1期11-14,共4页
Yunnan Water Power
关键词
大朝山水电站
截流
工程管理
水电站
Dachaoshan Hydropower Project River closure Project management