摘要
1998年工务工作仍以既有线提速为重点,强化改造京广线的线桥设备,加快施工作业机械化进程,加快企业管理科学化步伐。
The key points of the permanent way work in 1998 are to raise train speeds on the existing lines, strengthen the upgrading of the equipment of the tracks and bridges on the Beijing-Guangzhou line, speed up the construction mechanization and quicken the pace of scientific enterprise management.
出处
《中国铁路》
1998年第4期1-5,共5页
China Railway
关键词
铁路工务
线桥结构
施工作业
企业管理
railway permanent way department,working policy and target, track and bridge struc-tures, construction, enterprise management