厦门海底隧道穿越F3风化深槽施工技术 被引量:5

Construction Technique of Xiamen Undersea Tunnel across F3 Weathered Trench
下载PDF
导出
摘要 针对厦门翔安隧道海域段F3风化深槽的地质特点,文章主要论述了采用周边帷幕注浆、超前长管棚进行预支护,以及采用三台阶法进行开挖的施工技术。经过综合超前地质预报,进一步探明了风化槽的规模、风化程度、涌水量及对施工的影响程度。施工过程中,根据掌握的地质资料,随时进行动态设计、动态施工,这种信息化的工作方法既能保证施工安全,又加快了工程进度,并能最大限度的节约建设投资。本工程施工中采用先进的施工设备以及现场组织管理工,作为顺利穿越F3风化深槽起到了很重要的作用。 In the construction of Xiamen Xiang'an tunnel, peripheral curtain grouting, advance long pipe-roofing and tri-bench excavation method have been taken based on the geological condition of deep F3 weathered trough passed by Xiang'an tunnel. By means of comprehensive geological forecast, it understood the scale, state and water inflow concerning the weathered trough further as well as its influence on the construction. Thus observational de- sign and construction have carried out under the help of useful geological documents, which ensures construction safety, speed up construction progress and decrease investment. Moreover advanced construction equipment and good management work also played a significant role for the excavation at the section passing through deep F3 weathered trough.
出处 《现代隧道技术》 EI 北大核心 2009年第3期71-80,共10页 Modern Tunnelling Technology
关键词 海底隧道 风化深槽 周边帷幕注浆 三台阶开挖法 施工技术 Undersea tunnel Weathered deep trench peripheral curtain grouting Tri-bench excavation method Construction technique
  • 相关文献

参考文献5

二级参考文献18

  • 1杨家岭,邱祥波,陈卫忠,李术才.海峡海底隧道及其最小岩石覆盖厚度问题[J].岩石力学与工程学报,2003,22(z1):2132-2137. 被引量:20
  • 2李术才,徐帮树,李树忱.海底隧道衬砌结构选型及参数优化研究[J].岩石力学与工程学报,2005,24(21):3894-3902. 被引量:46
  • 3[2]张民庆,韩占波,孙国庆,等.圆梁山隧道PDK354+255~PDK354+275溶洞段施工技术[J].铁道工程学报,2002,(4):71-78.(Zhang Minqing,Han Zhanbo,Sun Guoqing,et al.Construction technology of cavity section PDK354+255~PDK354+275 in parallel heading at intake portal of Yuanliangshan Tunnel[J].Journal of Railway Engineering Society,2002,(4):71-78.(in Chinese))
  • 4[5]张民庆.饱和含水砂层施工技术[A].见:第十届隧道年会论文集[C].[s.l.]:[s.n.],1998.543-547.(Zhang Minqing.Engineering technique of saturation and containing water sand[A].In:Proceedings of the 10th Tunnel Academic Conference Symposium[C].[s.l.]:[s.n.],1998.543-547.(in Chinese))
  • 5Gronhaug A. Requirements of geological studies for undelsea tunnels[J]. Rock Mechanics, 1978, 15(5): 978.(Abstract)
  • 6Kuesel T R. Alternative concepts for undersea tunnels[J]. Tunneling and Underground Space Technology, 1986, 1 (1): 283 - 287.
  • 7Soejima E K. Planning and design of the Osaka Port undersea tunnel[J]. Civil Engineering in Japan, 1991, 30:44 - 53.
  • 8Arild P. The challenge of subsea tunneling[J]. Tunneling and Underground Space Technology, 1994, 9(2): 145-150.
  • 9Eisenstein Z. Large undersea tunnels and the progress of tunneling technology[J]. Tunneling and Underground Space Technology, 1994,9(3): 283 - 292.
  • 10Dahlo T S, Nilsen B. Stability and rock cover of hard rock subsea tunnels[J]. Tunneling and Underground Space Technology, 1994,9(2); 151 - 158.

共引文献323

同被引文献25

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部