多资源约束下航天多项目调度的启发式算法 被引量:3

Heuristic Algorithm for Aerospace Multi-project Scheduling with Multi-resource Constraints
下载PDF
导出
摘要 为解决当前航天多型号并举研制现状下的资源约束多项目调度问题,首先建立了一个数学模型,然后根据模型的特点提出了一种启发式算法。建立的模型同时考虑多项目的总工期和各个单项目的总工期,提出的算法在考虑活动资源可剥夺以及单个活动需要多个资源的情况下,能够合理优化多项目的资源分配,缩短多项目的总工期及各项目工期。通过实例验证该方法能够有效地求解多项目调度问题,具有一定的工程应用价值。 To solve the multi-project scheduling problem with multi-resource constraints in aerospace industry, a mathematical model was built and a heuristic algorithm was introduced based on the model. The model is proposed with the target of minimizing the weighted sum of multiproject total duration and single project duration. Considering a single activity requires multi- resource and resource can be deprived, the algorithm can optimize the resource allocation among project activities and achieve the goal of the model. The case study shows that the model and algorithm have practical value for engineering application.
出处 《中国空间科学技术》 EI CSCD 北大核心 2009年第3期64-70,77,共8页 Chinese Space Science and Technology
基金 中国光华科技基金资助项目(20071101)
关键词 资源约束 多项目调度 启发式算法 资源分配 航天工程管理 Resource constraints Multi-project scheduling Heuristic algorithm Resource allocation Space engineering management
  • 相关文献

参考文献9

  • 1国亮,邓祥辉,国蓉.基于遗传算法的多项目资源约束优化问题研究[J].西安工业大学学报,2007,27(6):591-594. 被引量:2
  • 2LOVA A,TORMOS P.Combining random sampling and backward-forward heuristics for resource-constrained multi-project scheduling[C].Proceedings of the 8th International Workshop on Project Management and Scheduling,Valencia,Spain,2002,244-248.
  • 3GONCALVES J F,MENDES J J M,RESENDE M G C.A genetic algorithm for the resource constrained multi-project scheduling problem[J].European Journal of Operational Research,2007.
  • 4寿涌毅.资源约束下多项目调度的迭代算法[J].浙江大学学报(工学版),2004,38(8):1095-1099. 被引量:46
  • 5邓林义,林焰,金朝光,陈明.资源约束下多项目调度的拓扑优化方法[J].系统仿真学报,2007,19(16):3846-3849. 被引量:11
  • 6RAINER K.Serial and parallel resource constrained project scheduling method revisited[J].European Journal of Operational Research,1996,90:320-333.
  • 7刘士新,宋健海,唐加福.基于关键链的资源受限项目调度新方法[J].自动化学报,2006,32(1):60-66. 被引量:63
  • 8TSAI D M,CHIU H N.Two heuristics for scheduling multiple projects with resource constraints[J].Construction Management and Economics,1996,14:325-340.
  • 9KURTULUS I,DAVIS E W.Multi-project scheduling:Categorization of heuristic rules performance[J].Management Science,1982,28(2):161-172.

二级参考文献29

  • 1寿涌毅.资源约束下多项目调度的迭代算法[J].浙江大学学报(工学版),2004,38(8):1095-1099. 被引量:46
  • 2傅杰,李仁发.基于权值的优先调度算法[J].系统仿真学报,2005,17(10):2549-2551. 被引量:8
  • 3方炜,欧立雄.多项目环境下新产品研发项目资源分配问题研究[J].管理工程学报,2005,19(B10):6-10. 被引量:13
  • 4郭研,宁宣熙.利用遗传算法求解多项目资源平衡问题[J].系统工程理论与实践,2005,25(10):78-82. 被引量:34
  • 5TURNER J R. The handbook of project-Based management [M]. London: McGraw-Hill, 1993.
  • 6KURTULUS I, DAVIS E W. Multi-project scheduling:Categorization of heuristic rules performance[J]. Management Science, 1982, 28(2): 161 - 172.
  • 7TSAI D M, CHIU H N. Two heuristics for scheduling multiple projects with resource constraints [J]. Construction Management and Economics, 1996, 14:325 -340.
  • 8SPRECHER A, KOLISCH R, DREXL A. Semi-active,active, and non-delay schedules for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 1995, 80: 94 - 102.
  • 9LI K Y, WILLIS R J. An iterative scheduling technique for resource-constrained project scheduling[J]. European Journal of Operational Research, 1992, 56: 370-379.
  • 10OZDAMAR L, ULUSOY G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis [J]. European Journal of Operational Research, 1996, 89: 400- 407.

共引文献107

同被引文献63

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部