摘要
通过对全院生产能力以及已完成的600MW工程实际进度的分析,对项目计划管理提出建议。
Based on the analysis of production ability of the whole institute and actual schedule of 600MW units projects which have been completed,advices for project planning management was put forward.
出处
《河南电力》
2009年第2期23-25,共3页
Henan Electric Power