期刊文献+

高速公路夜间养护作业交通适用条件研究 被引量:1

Appropriate Traffic Conditions for Nighttime Maintenance on Expressway
下载PDF
导出
摘要 针对目前高速公路大流量交通条件下进行养护作业易造成交通拥堵的现状,提出了进行夜间养护维修作业的建议,对高速公路夜间养护作业的交通适用条件进行研究,给出了上海高速公路夜间养护作业的流量界限建议值,并以应用实例说明。 The congestions caused by the maintenance under heavy traffic on the expressway happen frequently today.Trying to deal with this problem,the opinion of nighttime maintenance is proposed in this paper.Then the appropriate traffic conditions under which the maintenance can be carried out without significant effect on the normal traffic are studied.Finally,the volume threshold for the nighttime maintenance is given with an example following.
出处 《上海公路》 2009年第2期9-11,18,共4页 Shanghai Highways
关键词 高速公路 夜间养护 交通适用条件 expressway nighttime maintenance appropriate traffic conditions
  • 相关文献

参考文献6

二级参考文献9

  • 1曹政国,李远富.模糊多属性决策在公路施工组织设计中的应用[J].中南公路工程,2005,30(1):161-164. 被引量:3
  • 2[1]Hancher,D.E.,Taylor T.R.(2000)."Night Time Construction Issues"[R].preprints of the Transportation Research Board 79th Annual Meeting,Washington,D.C.
  • 3[2]New York State Department of Transportation (NYSDOT)(1999)."NighttimeConstruction Program"[R].Division of Management Audit and State Financial Services,Report; 98-S-50.
  • 4[3]New York State,Department of Transportation (NYSDOT) (1997)." Report on Nighttime Construction by N.Y.DOT".[R].
  • 5[4]Abd Elrahman,O.,Perry,R.J.(1994)."Nighttime Construction Operations"[R].Engineering research and Development Bureau,New York State Dept of Transportation,Special report 116.
  • 6[5]Ellis,R.D.,Herbsman,Z.,Kumar,A.,Chheda,P.(1992)."Developing Night Operations in Florida:Final Report"[R].Report No.4910450441612,Sponsored by Florida Department of Transportation in cooperation with the Federal Highway Administration,Gainesville,Florida.
  • 7[6]Kimber D,Douglas,Ph.D.,P.E."Selection Criteria For Using Nighttime Construction And Maintenance Operations"[R].Report No.FHWA-OR-RD-03-13.Oregon Devartment of Transportation Research Unit and Federal Highway Administration.
  • 8广东省交通科学研究所,广佛高速公路调查报告及处治方案设计[Z].1999.
  • 9JTJ076-95.公路工程施工安全技术规程[S].[S].,..

共引文献634

同被引文献9

  • 1Rakha H,Zhang W. Consistency of shock-wave and queuing theory procedures for analysis of roadway bottlenecks[A].Washington,DC,2005.
  • 2Chin H C. Re-examination of the analysis of freeway bottlenecks[J].ITE Journal,1996,(01):30-35.
  • 3Daganzo C F. Fundamentals of Transportation and Traffic Operations[M].Oxford:Pergamon Press,1997.
  • 4Kermode D. A field procedure for determining effects of lane closures[R].Los Angeles:California Department of Public Works,1969.
  • 5Caltrans. Deputy Directive-60-R1[R].Sacramento,CA:California Department of Transportation,2009.
  • 6TRB. Highway Capacity Manual 2010[M].Washington,D.C.:Transportation Research Board,National Research Council,2010.
  • 7Krammes R A,G O Lopex. Updated short-term freeway work zone lane closures capacity values[R].Washington,D.C.:Journal of Transportation Research Record 1442,TRB,National Research Council,1994.49-56.
  • 8Caltrans. Changeable message sign guidelines[M].Sacramento,CA:California Department of Transportation (Caltrans),2006.
  • 9Caltrans. Traffic management plan effectiveness study[R].Sacramento,CA:California Department of Transportation,1993.

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部