摘要
为更好地反映小清河主槽、滩地的水流分布情况及拟开发工程对水流的约束作用,分析工程建成后水流的实际流动情况和水流对拟建工程的影响,本文采用深度平均二维水流数学模型就水流对滩地开发的影响进行模拟,确定了可行的开发方案。
For the purpose of reflecting the flow distribution of Xiaoqing River's preferably, exhibitting the restraining action to flow of the proposed developmen main channel and bottomland t project, analyzing the actual water flow and the effect of flow on the proposed works after the project completed, the effect of flow on the bottomland exploitation was simulated by depth - averaged two - dimensional mathematical model of water flow, and the feasible program was confirmed.
出处
《山东农业大学学报(自然科学版)》
CSCD
北大核心
2009年第3期425-428,共4页
Journal of Shandong Agricultural University:Natural Science Edition
关键词
数值模拟
有限元
滩地
整治开发
河口
Numerical simulation
finite element
bottomland
regulation development
estuary