摘要
矿区GPS控制网数据处理过程中,不可避免地会遇到长度投影变形的处理,在高海拔地区这个问题更加突出。通过矿区控制网实例,计算分析了长度投影变形,选择抵偿投影面建立矿区独立坐标系,限制了矿区长度投影变形,并通过解决方案的分析讨论,提出了高海拔地区处理矿区控制网长度投影变形的基本方法。
In the date process of GPS control network in mining area, it shall be inevitable to treat the deformation of length projection, and this problem is more outstanding in high altitude region. In this paper, based on an actual GPS control network in mining area,the deformation of length projection is computed and analyzed,in which a compensation projection plane is selected to establish an independent coordinate system for mining area in order to restrict the deformation of length projection. After analyzing and discussing the solution for deformation of length projection, a basic approach to treat the deformation of length projection of control network for mining area in high altitude region is put forward.
出处
《矿业研究与开发》
CAS
北大核心
2009年第3期21-23,共3页
Mining Research and Development
基金
中铁总公司铁二院计划(0416148)
关键词
高海拔
控制网
高程抵偿面
长度变形
High altitude, Control network, Height compensation plane, Length deformation