摘要
国投新集能源有限公司杨村煤矿地质条件复杂,下第三系红层埋藏较深,强风化带既深且长,地层裂隙发育,钻进难度很大,在施工中出现了一些钻孔内事故,通过采取有效办法,克服了困难,确保了工程质量。
The engineering geological condition of Yangcun Coal Mine is complicated, the latente of down third System is imbedded deeply, the zone of weathering is very deep and long, and crack growing. So, it is difficultly to hole, and there are many accidents. The paper analyses the reasons and provides some measures to solve the problems.
出处
《煤炭技术》
CAS
北大核心
2009年第7期126-127,共2页
Coal Technology
关键词
地面预注浆
孔内事故
事故处理
ground pre-grouting
hole accident
accident treatment