期刊文献+

铝电解多功能机组主梁腹板预制拱度确定方法 被引量:1

Determining Method of Web Plate's Prefabricated Camber on Main Girder of Aluminum Electrolysis Multifunctional Unit
下载PDF
导出
摘要 针对铝电解多功能机组主梁腹板预制拱度过大或过小、导致生产中出铝小车和工具小车运行时发生爬坡或下滑的问题,根据由理论计算的主梁跨中静挠度值以及与主梁焊接时引起拱度值变化的实际经验,给出确定主梁腹板预制拱度的一种方法,此方法解决了生产实际中出现的问题。对于设计与制造铝电解多功能机组主梁腹板具有参考意义。 In order to solve the problem that the prefabricated camber size of main girder's web plate on aluminum electrolysis multifunctional unit is too big or small, resulting in climbing or gliding problem of tapping trolley and tool trolley during production. According to the natural bow of the main girder mid span obtained by theoretical calculation, as well as the practical experience of the main girder camber variation during main gird- er' s welding. This paper proposes the method to prefabricate web plate' s camber of main girder correctly, solves the problem during production practice, it is able to be referred in design and manufacture of main girder's web plate on aluminum electrolysis multifunctional unit.
作者 高忠江
出处 《有色设备》 2009年第3期12-14,42,共4页 Nonferrous Metallurgical Equipment
关键词 铝电解 主梁 腹板 静挠度 拱度 aluminum electrolysis main girder web plate natural bow camber
  • 相关文献

参考文献4

  • 1YS/T7-2008.铝电解多功能机组[S].
  • 2GB/T3811-2008起重机设计规范[S].
  • 3GB/T3814405-1993.通用桥式起重机[S].
  • 4成大先.机械设计手册[M].北京:化学工业出版社,2002..

共引文献1445

同被引文献1

  • 1GB/T 14405—2011通用桥式起重机[S].

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部