摘要
介绍了岱山县长涂镇5000m3/d反渗透海水淡化工程的设计方法,包括海水的取水、一级预处理、反渗透等系统的设计参数及设备配置情况。一年多的运行结果表明,该工程工艺合理,处理效果良好,出水水质达到了设计标准,及时为当地解决了淡水资源短缺的问题。
The design method of the engineering project of 5 000 m^3/d reverse osmosis desalination is introduced, which includes the design parameters and device configuration for seawater intake, first level pretreatment, reverse osmosis and so on, in Changtu Town, Daishan County. The operation resuits for more than a year show that this engineering technology is reasonable, the treatment efficiency is good, and the treated water can meet the design standard. This engineering project has solved the problem of shortage of freshwater for local people.
出处
《中国给水排水》
CAS
CSCD
北大核心
2009年第14期40-42,47,共4页
China Water & Wastewater
关键词
长涂海水淡化厂
海水淡化
反渗透
Changtu Seawater Desalination Plant
seawater desalination
reverse osmosis