大口径供水管道牵引穿越河流工程的设计与施工 被引量:5

Design and Construction of River Crossing Project of Large-diameter Water Supply Pipeline Using Traction Technology
下载PDF
导出
摘要 在临港工业区DN1400供水管道穿越海河工程中,采用牵引沉管技术进行了河底穿越(倒虹管)施工,对钢管进行整体焊接、防腐、拼装后浮运至管槽水面,然后充水下沉安装就位。详细介绍了施工方法及具体技术措施,可供相关工程参考。 In the Haihe River crossing project of DN1 400 water supply pipeline in Lingang Industrial Area, the immersed tube traction technology ( inverted siphon) was used. After welding, anti-corrosion and assembling on the riverside, the steel pipe was floated into over the trench, and water was filled in the pipe to make it sink down to the trench. The construction method and the concrete technical measures are introduced, which can provide a reference for the relevant works.
出处 《中国给水排水》 CAS CSCD 北大核心 2009年第14期99-102,共4页 China Water & Wastewater
关键词 临港供水工程 管道 设计 施工 Lingang water supply project pipeline design construction
  • 相关文献

参考文献1

二级参考文献1

  • 1SY/T4106—2005,管道无溶剂聚氨酯涂料内外防腐层技术规范[S].

共引文献8

同被引文献12

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部