摘要
介绍了上海轨道交通9号线二期工程6A标段——徐家汇地下商城向下加层工程中低净空条件下的静压钢管群桩施工对周边环境的影响。通过严谨、合理的施工工艺、压桩工序以及施工监测,确保了压桩施工的顺利进行,可供类似条件下的静压桩施工参考。
It introduced the impact on environment from the 6A contract section of the 2nd phase of Shanghai Rail Transit Line 9.The 6A contract section makes a construction of static pressure steel pipe pile group under a lower clearance condition.Through precise and rational construction technique,construction sequence,and information based construction,pile-pressing construction is successful,providing the reference for that under similar condition.
出处
《地下工程与隧道》
2009年第2期13-16,共4页
Underground Engineering and Tunnels