摘要 以某输电线路跨越塔桩基计算为例,针对桩土接触问题的高度非线性,通过引入三维接触单元来模拟桩与桩侧土体之间的非线性"滑移破坏",采用弹塑性有限元的方法计算了桩土共同作用下的桩基位移及应力,确定了桩侧土体可能产生缝隙的宽度和深度,并在此基础上复核土体的渗流特性。计算结果表明:在各种不利荷载组合作用下,跨越塔桩基与土层的缝隙开展宽度及深度均非常有限,桩体所受的拉、压应力均较小,桩基建设对渗流场整体分布特征的影响极为微弱。 The calculation of pile foundation, which is the outlet power tower, is taken as an example in this paper. Considering the nonlinear of the contact between the pile and the soil, the contact element is introduced to simulate the slippage breakage. To compute the displacement and stress of the pile foundation, which is under the action of the pile and soil, the contact element is adopted, and the method of elastic and plastic finite element is used. The extent and depth of the gap around the pile foundation is confirmed. In addition, the seepage behavior is checked on this basis. The result shows that under various loads, the extent and depth of the gap around the pile foundation is limited, the stress is also small. The seepage field is influenced the least by the pile building.
出处 《中国农村水利水电》 北大核心 2009年第7期80-82,85,共4页 China Rural Water and Hydropower
关键词 桩基 接触 开裂 位移 应力 pile foundation craze contact displacement stress
  • 相关文献

参考文献3

二级参考文献9

  • 1殷宗泽,朱泓,许国华.土与结构材料接触面的变形及其数学模拟[J].岩土工程学报,1994,16(3):14-22. 被引量:392
  • 2林天健 等.桩基础设计指南[M].北京:中国建筑工业出版社,1995..
  • 3[1]JGJ 94-94,建筑桩基技术规范[S].
  • 4[5]Desai C.S,Zaman M M.Thin-layer element for interfaces and joints[J].International Journal for Numerical and Analytical Methods in Geomechanics,1984,8(1):19-43.
  • 5[6]Desai C.S,Youzhi Ma.Modeling of joints and interfaces using disturbed state concept[J].International Journal for Numerical and Analytical Methods in Geomechanics,1992,16(6):625-653.
  • 6[4]杨桂华.复合桩基非线性工作性的数值模拟及分析[D].北京:中国矿业大学(北京),2004.
  • 7[5]Analysis of Downdrag on Pile Groups by Finite Element Method[J].Computers and Geotechnics,1997,21(2):147.
  • 8W. X. Zhong and S. M. Sun. A Finite Method for Elastic-plastic Structure and Contact Problem by Parametric Quadratic Programming, Int. J. Numer. Methods Engrg. 1988,26,2723 - 2738.
  • 9管自立.广义复合桩基——疏桩基础设计的若干问题[J].建筑结构,2003,33(4):40-45. 被引量:10