摘要 文中针对燃煤电厂粉煤灰存储问题,以大唐洛河发电厂贮灰场采取水力冲填法技术对原有贮灰场进行增容改造工程为例,介绍了水力冲填技术的应用、施工工艺、质量管理、施工管理等方面的成功做法。对同类型燃煤电厂粉煤灰存储、延长贮灰场的使用年限、降低贮灰场工程造价、节约耕地、保护环境具有一定的借鉴作用。 In this paper,the issue of coal-fired power plant fly ash storage to Datang Huainan Ash Yard Luohe plant to take water filling technique of the original capacity ash field renovation project as an example,the hydraulic fill technology, construction technology,quality management,construction management,successful practices. On the same type of coal-fired power plant fly ash storage,to extend the storage life span of gray market,lower cost storage yard,saving farmland,protecting the environment has a certain reference.
机构地区 大唐洛河发电厂
出处 《安徽电力》 2009年第2期75-77,共3页 Anhui Electric Power
关键词 燃煤电厂 水力填充法 贮灰场 增容改造 方法 coal-fired power plant hydraulic fill method storage yard compatibilizer system method
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部