综采边开帮边安装支架工艺的实践

Practice of Installing Supports Technology With Driving Sides in Fully Mechanized Mining
下载PDF
导出
摘要 传统的综采工作面安装采用先施工好切眼,然后再安装设备的方法。此种方法工艺简单,但施工工期长,维护大断面切眼顶板困难。随着综采安装技术的成熟,新安煤矿在学习、实践中摸索出一套边开帮边安装支架的方法,更好地维护了安装地点的顶板,缩短了安装工期。 The install of the traditional fully mechanized coal face adopts a method of erecting equipments after constructing to cutting holes well. the method is very easy, but it has shortcomings. For example, time limit for a project is very long and safeguards cutting holes roofs of the big section are very difficult. With the ripe skill of the full mechanized install, Xin'an Coal Mine gropes a goal way that the workers are cutting the side while they are fixing the support so that it safeguards the roofs of fixing place better and shortens time limit for a project of the mount.
作者 李强
出处 《煤炭技术》 CAS 北大核心 2009年第8期60-62,共3页 Coal Technology
关键词 综采工作面 顶板管理 支架安装 fully mechanized coal face roof management supports mount
  • 相关文献

参考文献1

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部