期刊文献+

高层建筑基坑施工技术处理实例 被引量:1

Foundation pit construction technology treatment example of high-rise building
下载PDF
导出
摘要 对高层建筑基坑施工中遇到的泥炭软弱层的处理和基坑管井降水达不到要求,而采取的明井降水的防水构造进行了说明,指出施工过程中采取的技术措施具有可靠、可行的特点,具有借鉴性,以使工程取得了良好的效果。 The author describes the waterproof structure of adopting the visible well precipitation because that the peat soft layer and the pit foundation pile well precipitation accounted in the foundation pit construction of the high-rise building can not reach the requirements, points out that the technology measures adopted in the construction process has characteristics of reliable and feasible, which has reference, so as to get good effect for project.
作者 刘启顺
出处 《山西建筑》 2009年第21期90-91,共2页 Shanxi Architecture
关键词 高层建筑 基坑 软弱下卧层换土 明井防水构造 措施 high-rise building, foundation pit, soft substratum soil replacement, visible waterproof structure, measure
  • 相关文献

参考文献1

二级参考文献1

  • 1曾国熙 卢肇钧 蒋国澄 等.地基处理手册[M].北京:中国建筑工业出版社,1988..

共引文献14

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部