摘要
对高层建筑基坑施工中遇到的泥炭软弱层的处理和基坑管井降水达不到要求,而采取的明井降水的防水构造进行了说明,指出施工过程中采取的技术措施具有可靠、可行的特点,具有借鉴性,以使工程取得了良好的效果。
The author describes the waterproof structure of adopting the visible well precipitation because that the peat soft layer and the pit foundation pile well precipitation accounted in the foundation pit construction of the high-rise building can not reach the requirements, points out that the technology measures adopted in the construction process has characteristics of reliable and feasible, which has reference, so as to get good effect for project.
出处
《山西建筑》
2009年第21期90-91,共2页
Shanxi Architecture
关键词
高层建筑
基坑
软弱下卧层换土
明井防水构造
措施
high-rise building, foundation pit, soft substratum soil replacement, visible waterproof structure, measure