摘要
叙述了施工过程阶段如何加强工程签证管理,防止工程索赔,控制工程造价,具体分析了施工现场签证存在的主要问题及相应解决的办法,以使签证能及时准确地反映工程实际情况,工程结算能够如实反映工程造价。
How to strengthen engineering visa management, prevent engineering claim and control engineering cost in construction process were illustrated. The problems existing construction field visa and corresponding resolving methods were proposed, so as to make visa reflect practical situation of engineering timely and accurately, the project settlement reflected engineering cost faithfully.
出处
《山西建筑》
2009年第21期242-243,共2页
Shanxi Architecture