期刊文献+

九江大桥连续箱梁现浇支架设计与施工 被引量:1

The design and construction of the bracket in Jiujiang big Bridge consecution sprinkle now box beam
下载PDF
导出
摘要 结合九江大桥扩建工程施工实例,就连续箱梁现浇支架设计与施工中钢管支架的设计要求、结构计算及施工作了详细介绍,实践证明:九江大桥采用V形钢管支撑架大大加快了引桥的施工,同时为保证工期的实现奠定了基础。 Combining Jiujiang big Bridge extension engineering construction, the paper detailed introduces design of the bracket in consecution sprinkle now box beam, design point of steel pipe bracket, construction compute and the construction, practice proof that Jiujiang big Bridge adoption V type steel pipe bracket can quickly fasten construction of lead bridge, at the same time for project time limit realization settle the foundation.
出处 《山西建筑》 2009年第21期322-323,共2页 Shanxi Architecture
关键词 连续箱梁 钢管支架 设计 施工 consecution box beam, steel pipe bracket, design, construction
  • 相关文献

参考文献4

二级参考文献3

  • 1李东明.连续箱梁挂篮施工线型控制方法[J].山西建筑,2007,33(3):275-276. 被引量:7
  • 2周水兴,何兆益,邹毅松.路桥施工计算手册[M].北京:人民交通出版社,2005.
  • 3徐岳,王亚君,万振江.预应力混凝土连续梁桥设计[M].北京:人民交通出版社,2005.

共引文献1942

同被引文献7

引证文献1

二级引证文献2

相关作者