摘要
通过分析某群塔施工在工程中的实际问题,根据现场实际情况,就塔吊布置、塔吊的选用等作了论述,并提出了针对性的处理措施,从而达到预防群塔作业时出现矛盾的目的。
Through analyzing actual problems in tower group construction and according to actual situation in place, the paper states about distribution of tower crane, choosing of tower crane and so on, it also proposes relative handling measures, so as to reach the aim of preventing problems in construction.
出处
《山西建筑》
2009年第23期157-158,共2页
Shanxi Architecture
关键词
群塔作业
塔吊
施工措施
风向
tower group, tower crane, construction measures, wind direction