期刊文献+

某特大桥盖梁顶裂缝的分析及处理

Analysis and treatment on a super large bridge capping beam top crack
下载PDF
导出
摘要 针对242省道临洪河特大桥工程施工中盖梁顶存在的两道裂缝,就相关的计算、有限元分析及观测等作了探讨,并对两道裂缝的成因作了调查分析,采取了相应的处理措施,以确保桥梁施工质量。 Against to two cracks existing in capping beam top during Linhong fiver super large bridge construction in 242 provincial road, it was discussed about related calculation, finite element analysis and observation. Two crack forming reasons were inspected and analyzed, and the corresponding measures were adopted, so as to guarantee bridge construction quality.
作者 宣有金 高波
出处 《山西建筑》 2009年第23期332-333,共2页 Shanxi Architecture
关键词 桥梁 盖梁顶 裂缝 验算 处理措施 bridge, capping beam top, crack, checking calculation, treating measures
  • 相关文献

参考文献1

二级参考文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部