摘要 通过对上海市某地铁盾构进洞中所遇到的问题和处理措施的研究,说明目前盾构进出洞中普遍存在的问题,并对相应的地基加固措施进行一定的比较和分析,指出了进洞土体为砂土时应注意的问题及相应的补救措施,并进一步提出了采用高压旋喷作为地基加固手段的缺陷。 According to the researches on existing problem and treatment measures in one railway shield entering cave in Shanghai city, the author describes the common existing pmblems of current shield entering and tunneling cave, and gets certain comparison and analysis on corre-sponding foundation reinforcement measures, points out the attention problems and corresponding remedial measures when the entering cave soil is sand, and further provides disadvantages of the foundation reinforcement way adopting high pressure jet grouting.
出处 《山西建筑》 2009年第23期356-358,共3页 Shanxi Architecture
关键词 地基加固 槽壁 高压旋喷 foundation reinforcement, groove wall, high pressure jet grouting
  • 相关文献

参考文献2

二级参考文献6

  • 1姚永勤 王明年.深圳地铁单洞双层隧道施工力学分析[J].工程力学,2003,.
  • 2广州市地下铁道总公司 广州市地下铁道设计研究院.广州地铁二号线设计总结[M].北京:科学出版社,2005..
  • 3北京城建设计研究总院.地铁设计规范[M].北京:中国计划出版社,2003..
  • 4地基处理手册(第二版)编写委员会.地基处理手册(第二版)[M].北京:中国建筑工业出版社,2002.
  • 5JJGA日本ジェシトグゥト协会.Jet Grourt.ジェシトグゥト工法[M].日本:平成2年2月.
  • 6王启耀,郑永来,凌宇峰,杨林德.近距离双线盾构隧道施工相互影响的监测与分析[J].地下空间,2003,23(3):229-233. 被引量:26