3[4]S Y IP. Effect of alternating aerobic and anaerobic conditions on the economics of the activated sludge system[J].Wat Sci Tech 1987,(19):911-918.
4汪慧贞.氧化还原电位作为生物除磷、氮过程控制参数[J].中国给水排水,1988,4(3):8.
5[9]H Zhao,S H Isaacs,H Soebberg. A novel control strategy for improved nitrogen removal in an alternating activated sludge process-PartⅠ:Process analysis[J].Wat Res,1994,28(3):521-534.
6[10]H Zhao,S H Isaacs,H Soebberg. A novel control strategy for improved nitrogen removal in an alternating activated sludge process-PartⅡ:Control development[J]. Wat Res,1994,28(3):535-542.
7[11]W C Chang,C F Ouyang ,W L Chiang. Sludge pre-recycle control of dynamic enhanced biological phosphorus removal system:An application of on-line fuzzy controller[J].Wat Res,1998,32(3):727-736.
8[12]Carl-Fredrik Lindberg,Bengt Carlsson. Nonlinear and set-point control of the dissolved oxygen concentration in an activated sludge process[J].Wat Sci Tech,1997,35(1):215-224.
9[14]Takashi Osada,Kiyonori Haga,Yasuo Harada. Removal of nitrogen and phosphorus from swine wastewater by the activated sludge units with the intermittent aeration process[J]. Wat Res,1991,25(17):1377-1388.