摘要 青海送变电公司承担着750 kV玛纳斯—乌鲁木齐北输电线路工程的Ⅱ标段,在施工中采用了扩径导线展放施工工艺。文章着重介绍一般普通钢芯铝绞线与扩径导线的不同之处,以及该新型导线在输电线路工程施工过程中的一些注意事项。通过其在该输电线路工程中的应用情况,扩经导线在今后的超高压线路建设中得到广泛的应用。 Qinghai Electric Power Transmission and Distribution Corporation undertakes the II section of 750kV Ma'aasi - north of Urumchi transmission line engineering, and construction technics of hole enlargement conductor paying off has been adopted. The paper emphatical introduces difference between common aluminium stranded conductor and hole enlargement conductor, as well as precautions of the newly conductor adoption in transmission line construction. Through the practical application of hole enlargement conductor in transmission line engineering, it can be broadly utilized in the future ultra high voltage transmission line construction.
作者 曾生伟
出处 《青海电力》 2009年第2期11-13,共3页 Qinghai Electric Power
关键词 750KV输变电工程 扩径 导线展放 施工工艺 750kV transmission line engineering hole enlargement conductor paying -off construction technics
  • 相关文献

参考文献3

  • 1李博之.高压架空输电线路施工技术手册(第2版)[M].北京:中国电力出版社,1998.
  • 2GB 50389-2006,750 kV架空送电线路施工及验收规范[S].中国计划出版社.
  • 3Q/GDW 124-2005,750 kV架空送电线路LGJK-300/50扩径导线架线施工工艺导则[S].