青海电力调度交换五级冗余网建设的探讨

Probe of Five-stage Redundancy Construction in Qinghai Power Dispatching Exchange Network
下载PDF
导出
摘要 青海省电网调度系统是青海电网各辖区电力负荷分配及调度指挥的中心,随着青海电网的快速发展,调度业务量的增加,使现有的调度交换网不能满足调度工作的需求。文章通过对双机同组技术分析以及工程论述,对青海电力调度交换网实现五级冗余双机同组的技术应用进行阐述,提出了对青海电力调度交换网优化的新思路。 The dispatching system of Qinghai power grid is the center of power load distribution and dispatching command of Qinghai power grid, with fast development of Qinghai power grid and improvement of dispatching business, the existing dispatching exchange network can' t satisfy dispatching demand. The paper discusses double - set same group technique and construction, and expounds the technique application of five - stage redundancy double - set same group of Qinghai power dispatching exchange network, as well as puts forward new ideas of optimizing Qinghai power dispatching exchange network.
出处 《青海电力》 2009年第2期52-54,58,共4页 Qinghai Electric Power
关键词 电力系统 调度交换网 双机同组 多级冗余 electric power system dispatching exchange network double - set same group multi - stage redundancy
  • 相关文献

参考文献2

二级参考文献3

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部