摘要
根据太原煤气化集团公司所属煤矿资源的情况,从煤炭生产的几个环节阐述提高煤炭资源采出率过程中存在的问题以及解决方法。
According to the situation of resources of Taiyuan Coal Gasification Group, from several sections of coal production, the author elaborated existing problems and solutions on the recovery rate of coal resources.
出处
《太原科技》
2009年第7期51-52,54,共3页
Taiyuan Science and Technology
关键词
煤炭资源
设计方案
施工过程
储量管理
采出率
coal resource
design
construction process
reserve management
recovery rate