任丘市首眼填砾地热井施工工艺 被引量:4

Construction Technology of the First Grave-filled Geothermal Well in Renqiu
下载PDF
导出
摘要 任丘市常规地热井存在含砂量高、孔壁易失稳等问题。在本区设计首眼填砾地热井,选择了Φ178 mm/Φ311 mm的管/孔径级配的成井结构。通过录井仪监测、泥浆性能控制等措施完成成孔施工;通过破壁替浆、静水填砾等程序完成成井施工。运行检验证明,施工工艺可行,成井质量可靠。 High sand content rate and unstable borehole wall exist in common geological well in Renqiu, and the gradation of 0178mm pipe and 31 lmm diameter was chosen for the first gravel-filled geological well in this area. Borehole construction was completed under the logging instrument monitoring and mud property control; well construction was eompleted by - breaking mud layer of the wall and gravel-filling in static water level. It was proved the construction technology was feasible and quality of well completion was reliable by operation test.
出处 《探矿工程(岩土钻掘工程)》 2009年第7期28-32,共5页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 地热井 深井填砾 钻井工艺 成井工艺 任丘 geological well gravel-filling in deep well drilling technology well completion technology Renqiu
  • 相关文献

参考文献2

  • 1刘久荣.地热回灌井堵塞的原因和防治[A].全国油区城镇地热开发利用经验交流会论文集[C].北京:冶金工业出版社,2003.
  • 2GB50296-99.供水管井技术规范[S].[S].,..

共引文献17

同被引文献21

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部