针对苍山铁矿选矿厂生产中存在的问题,在充分论证改造方案的基础上,边生产、边改造,使选厂处理能力得到了大幅度的提高,取得了显著的经济效益。
In view of the problems in the concentrator of Cangshan Iron Mine, based on the study of modification plan the process is being modified while the concentrator is in production. The capacity of the concentrator is improved, and remarkable economic benefit is obtained .
出处
《中国矿山工程》
2009年第3期25-27,51,共4页
China Mine Engineering
关键词
选矿工艺
精矿品位
回收率
磨机利用系数
磁场强度
mineral processing process
concentrate grade
recovery rate
mill utilization rate