管道穿河埋深综合判定 被引量:1

Integrated to Determine the Buried Depth of River-crossing Pipeline
下载PDF
导出
摘要 管道穿河的埋深问题一直是岩土工程勘察的重点问题,埋深过浅会导致洪水来临时,管道被冲刷露出,造成安全问题;埋深过深会增加不必要的经济浪费。但是对于埋深计算,一直没有相关规范出台,实际应用中多是相关经验公式粗略估计。这些经验公式常由于假设或使用条件的限制,存在较大的差异。在综合考虑各公式计算前提的基础上,评判该前提条件对计算结果的影响,并依此锁定埋深计算的上下限之间的差值,为最终可靠的断定埋深提供了重要的参考。 It is a key problem that the buried depth of river - crossing pipeline in geotechnical engineering investigation. The shallower depth will lead to safety problem, basseted by the scouring, when the flood is coming. On the other hand, the deeper depth will caused by the economic waste. As for the calculation of the buried depth has no suitable code but a rough estimate in practical application. These experiential formulas have big difference because they are restricted by the conditions of assumption and application. Based on the precondition of considering formulas calculation, evaluate its influence to the calculation results and lock the difference value of buried depth calculation between upper and lower limit. It will provide an important reference to determine the buried depth of river- crossing pipeline.
作者 董章增
出处 《水利科技与经济》 2009年第8期677-678,共2页 Water Conservancy Science and Technology and Economy
关键词 管道埋深 冲刷深度 综合分析 河流穿越 buried depth of pipeline scour depth comprehensive analysis crossing river
  • 相关文献

参考文献2

共引文献6

同被引文献16

  • 1XIE Zuo-tao ZHANG Xiao-feng TAN Guang-ming YANG Fang-li.NUMERICAL SIMULATION OF 2D HORIZONTAL COOLING WATER DISCHARGE IN GENERALIZED CURVILINEAR COORDINATE[J].Journal of Hydrodynamics,2006,18(1):91-96. 被引量:11
  • 2Ataie-Ashtiani,B.,Baratian-Ghorghi,Z.,Beheshti,A. A.Experimental investigation of clear-water local scour of compound piers. Journal of Hydraulic Engineering ASCE . 2010
  • 3Bolduc,L. C.,Gardoni,P.,Briaud,J.Probability of exceedance estimates for scour depth around bridge piers. Journal of Geotechnical and Geoenvironmental Engineering . 2008
  • 4Highway Planning and Design Institute,Ministry of Communications (HPDIMC).Specifications for Survey and Design of Highway Bridge Site. (JTJ 062-91) . 1991
  • 5Huang,J. C.,Wang,Z. Y.,Liu,Z. P.Flow Scour and Pipeline’s Buried. . 1998
  • 6Koustuv,D.,Susanta,C.Bridge pier scour in clay-sand mixed sediments at near-threshold velocity for sand. Journal of Hydraulic Engineering ASCE . 2010
  • 7Lai,J. S.,Chang,W. Y.,Yen,C. L.Maximum local scour depth at bridge piers under unsteady flow. Journal of Hydraulic Engineering ASCE . 2009
  • 8Lu,D.,Cai,C. S.Bridge scour: Prediction,modeling,monitoring,and countermeasures—Review. Practice Periodical on Structural Design and Construction . 2010
  • 9Saleh,A. W.Estimation of channel depth during floods by canonical correlation analysis. Journal ofHydraulic Engineering . 1993
  • 10Xie,X. P.,Wang,Z. Y.,Melching,C. S.Formation and evolution of the Jiuduansha Shoal over the past 50 years. Journal of Hydraulic Engineering ASCE . 2009

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部