期刊文献+

Set methods of left-turn waiting zone at signalized intersection 被引量:2

Set methods of left-turn waiting zone at signalized intersection
下载PDF
导出
摘要 To maximize the number of vehicles passing by the stop-line in a cycle and improve the operation efficiency of intersection in China, the settlement of left-turn lane waiting-zone is becoming prevailing. Based on conflicting-point method, the internal mechanism of left-turn flow after stopping line was analyzed through taking postposition left-turn lane waiting-zone intersection for instance. The relationship between the first left-turn vehicle and the last vehicle of previous phase passing the conflicting point was expounded. According to the time of successive arriving of two vehicle flows at conflicting-point, the reasonable layout for waiting area of left-turn vehicles was researched when the clearance index was less than O. The results suggest that the appropriate layout for waiting area of left-turning vehicles can improve the operation efficiency of intersections. To maximize the number of vehicles passing by the stop-line in a cycle and improve the operation efficiency of intersection in China,the settlement of left-turn lane waiting-zone is becoming prevailing. Based on conflicting-point method,the internal mechanism of left-turn flow after stopping line was analyzed through taking postposition left-turn lane waiting-zone intersection for instance. The relationship between the first left-turn vehicle and the last vehicle of previous phase passing the conflicting point was expounded. According to the time of successive arriving of two vehicle flows at conflicting-point,the reasonable layout for waiting area of left-turn vehicles was researched when the clearance index was less than 0. The results suggest that the appropriate layout for waiting area of left-turning vehicles can improve the operation efficiency of intersections.
出处 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2009年第3期318-321,共4页 哈尔滨工业大学学报(英文版)
基金 Sponsored by the National Natural Science Foundation of China(Grant No.70631002) Youth Science &Technology Foundation of Xi’an University of Architecture &Technology(Grant No.0608)
关键词 left-turn waiting zone collision point analysis methodology clearance index 信号交叉口 左转 设置方法 冲突点法 十字路口 经营效率 运行效率 车辆
  • 相关文献

同被引文献15

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部