期刊文献+

中小型拱坝表孔大流量泄洪消能建筑物体形研究 被引量:2

Shape Study on Large-discharge Flood-releasing Energy Dissipator for Crest Spillway of Medium and Small-sized Arch Dam
下载PDF
导出
摘要 依据圆满贯工程水工水力学模型试验资料,对中小型拱坝表孔大流量泄洪建筑物体形问题进行研究,提出了一种复合消能工体形与设计思路,即采用宽尾墩窄缝纵向水舌与连续鼻坎横向扩散的综合形式,可使水舌在纵向与横向实现全范围的扩散,充分利用消能空间与水体,既适应了不同流量洪水泄洪的要求,又使消能率得到大幅度提高,大流量泄洪冲坑深度可减小28%。 Base on the experimental study on hydraulics model of Yuanmanguan hydropower station, this paper researches the shape of large-discharge flood-releasing energy dissipator for crest spillway of medium- & small-sized arch dam and puts forward a shape and design concept of a compound energy dissipator, that is, adopting the comprehensive type of the longitudinal nappe of flaring gate pier and transverse spread of continuous bucket lip which can make water nappe to spread in whole range in the longitudinal and transverse directions so as to reach full energy dissipation. It could meet the needs of flood releasing with different discharges but also can greatly enhance the energy dissipation ratio and reduce the depth of scouring pit up to 28%.
出处 《水力发电》 北大核心 2009年第6期28-31,共4页 Water Power
关键词 中小型拱坝 表孔 消能 冲坑深度 medium and small-size arch dam crest spillway energy dissipation depth of scouring pit
  • 相关文献

参考文献11

二级参考文献10

  • 1水利水电泄水工程与高速水流信息网 东北勘测设计研究院科学研究所.泄水建筑物的破坏与防治[M].成都:成都科技大学出版社,1996..
  • 2刘沛清.混凝土高坝泄洪布置形式与消能防冲设计综述[J].高速水流与泄水工程,1997,(4):1-10.
  • 3艾克明.挑流消能的冲刷破坏及防治[J].泄水工程与高速水流,1995,(3).
  • 4陈椿庭.高坝大流量泄洪建筑物[M].北京:水利电力出版社,1998..
  • 5王奎译.欣古坝的消能系统[A]..见:峰谷建坝布置及消能防冲译文集[C].北京:水利出版社,1983..
  • 6张志恒 徐根海.黄河拉西瓦水电站全地下厂房方案水工整体模型试验研究报告[R].西北水利科学研究所,2002,4..
  • 7张志恒 徐根海.黄河拉西瓦水电站(2002)方案泄水建筑物消能工体型优化试验研究阶段报告[R].西北水利科学研究所,2002,11..
  • 8尹宏昌 苑润保.泄水工程水力学[M].吉林:吉林科学技术出版社,2002,10..
  • 9刘沛清,高季章,李忠义.水垫塘的水流特征及其综合评价指标[J].长江科学院院报,1997,14(1):1-6. 被引量:6
  • 10刘沛清,高季章,李永梅.高坝下游水垫塘内淹没冲击射流实验[J].中国科学(E辑),1998,28(4):370-377. 被引量:22

共引文献52

同被引文献8

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部