摘要
简要介绍了王台矿井的概况,重点探讨了双巷施工工艺及施工组织方法,并对其实施效果和综合效益进行了分析。
This paper briefly introduces the general situation of Wangtai Mine, emphatically probes into the two-way tunnelling technique and construction organizing method, and analyzes its carryover effects and comprehensive benefits.
出处
《科技情报开发与经济》
2009年第18期202-204,共3页
Sci-Tech Information Development & Economy
关键词
综掘双巷掘进工艺
施工工艺
施工组织方法
comprehensive mechanized two-way tunnelling technique
construction technique
construction organizing method