Mechanical Completion of Oxidation Reactor of the PTA Unit at Nanjing Baose Stock Company Passed Acceptance Test

Mechanical Completion of Oxidation Reactor of the PTA Unit at Nanjing Baose Stock Company Passed Acceptance Test
下载PDF
导出
摘要 In February 2009 the first in China one-million-ton-class oxidation reactor of the PTA unit developed by the Nanjing Baose Stock Company had passed the acceptance test on mechanical completion of the equipment and had In February 2009 the first in China one-million-ton-class oxidation reactor of the PTA unit developed by the Nanjing Baose Stock Company had passed the acceptance test on mechanical completion of the equipment and had been shipped to the PTA base at the Pengwei Petrochemical Limited Liability Co. in Chongqing Fuling. The appraisal of the said equipment as quoted by relevant experts is as follows.
出处 《China Petroleum Processing & Petrochemical Technology》 SCIE CAS 2009年第2期42-42,共1页 中国炼油与石油化工(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部